Technical Interconnection, Codes ... Utility Interconnection Process
Interconnecting distributed PV onto a grid safely, reliably, and cost-effectively requires that utilities and customers must follow specific rules, procedures, and agreements. Interconnection standards and codes are typically a multi-step process that dictate where and how DPV can be connected to the grid (see figure below). In some cases, smaller, simple DPV systems may be eligible for an expedited (i.e. “fast-track”) review process. Technical screens are a set of basic questions that identify if a DPV system poses grid safety or reliability concerns. Larger systems that do not fit requirements or pass screens may have to be studied in detail to determine grid impacts and mitigation strategies. Interconnection standards are typically followed by a permitting process managed by a local jurisdiction. Equipment standards dictate the requirements of DPV components (e.g. inverter) to maintain system reliability.
https://greeningthegrid.org/Distributed-photovoltaics/Topics-and-resources/topics-resources-media/technical-interconnection-codes-utility-interconnection-process/view
https://greeningthegrid.org/Distributed-photovoltaics/Topics-and-resources/topics-resources-media/technical-interconnection-codes-utility-interconnection-process/@@download/image/utility interconnection process.png
Technical Interconnection, Codes ... Utility Interconnection Process
Interconnecting distributed PV onto a grid safely, reliably, and cost-effectively requires that utilities and customers must follow specific rules, procedures, and agreements. Interconnection standards and codes are typically a multi-step process that dictate where and how DPV can be connected to the grid (see figure below). In some cases, smaller, simple DPV systems may be eligible for an expedited (i.e. “fast-track”) review process. Technical screens are a set of basic questions that identify if a DPV system poses grid safety or reliability concerns. Larger systems that do not fit requirements or pass screens may have to be studied in detail to determine grid impacts and mitigation strategies. Interconnection standards are typically followed by a permitting process managed by a local jurisdiction. Equipment standards dictate the requirements of DPV components (e.g. inverter) to maintain system reliability.